Appomattox County Unincorporated, Virginia · General provision
19.6-76.3.1(A)(2)
Dimensional standards
Servicing
- Geographic extent
- Areas shown on FIRM as AE or AH zones
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- No development causing >1 foot increase
no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as Zones A1-30, AE, or AH on the FIRM, unless it is demonstrated that the cumulative effect... will not increase the water surface elevation of the base flood more than one foot
From the ordinance
no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as Zones A1-30, AE, or AH on the FIRM, unless it is demonstrated that the cumulative effect... will not increase the water surface elevation of the base flood more than one foot