Dimensional standards
Servicing
- Geographic extent
- Areas seaward of the limit of moderate wave action (LiMWA) line, subject to wave heights between 1.5 and 3 feet, labelled as AE on the FIRM.
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Freeboard requirement1 ft
Lowest floor elevated to or above base flood elevation plus one foot of freeboard.
From the ordinance
Buildings and structures within this zone shall have the lowest floor elevated to or above the base flood elevation plus one foot of freeboard, and must comply with the provisions in Article III, Section 3.1.A.2 and Article IV, Sections 4.2 and 4.3.