Covington, Virginia · General provision

Article III, Section 1

Dimensional standards

lot requirementsSTREETbuildable areaFront 24 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

From the ordinance

Yard, front, means an open space on the same lot with a building, between the front line of the building (exclusive of steps, stoops, not exceeding 24 square feet in area, eaves, cornices, window sills and belt course), and the front lot or street line and extending across the full width of the lot.
Article III, Section 1