Leesburg, Virginia · General provision

Sec. 9.5.3

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Refuse Management

    Adequate refuse management, security, emergency services, and similar necessary facilities and services shall be available.

  • Site Suitability

    The site is suitable for the proposed use, considering flood hazard, drainage, soils and other conditions which may constitute a danger to life, health or property.

  • Environmental Impact

    The use shall not have a substantial adverse impact on the natural environment, including trees, ground cover and vegetation.

  • Traffic Safety

    The use shall not create hazardous conditions for vehicular or pedestrian traffic or result in traffic in excess of the capacity of streets serving the use.

  • Protection of Adjacent Uses

    Adjacent uses shall be suitably protected from any adverse effects of the use, including noise and glare.

From the ordinance

No temporary use shall be permitted unless adjacent uses protected from noise and glare, no hazardous traffic, adequate refuse management, site suitable considering flood hazard, no substantial adverse impact on natural environment.
Sec. 9.5.3