Portsmouth, Virginia · General provision

Sec. 40.2-536(B)

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Certificate of Appropriateness required for exterior changes

    A COA is required prior to initiating any material change in appearance to the exterior of a building, structure, or lot located in an historic district and the Downtown Design Overlay District that can be seen from a right-of-way.

From the ordinance

A COA is required prior to initiating any material change in appearance to the exterior of a building, structure, or lot located in an historic district and the Downtown Design Overlay District that can be seen from a right-of-way.
Sec. 40.2-536(B)