Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Application lead time45 days
An application for a Temporary Use Permit for a carnival or circus shall be submitted at least 45 days prior to the commencement of the temporary use.
- Exempt from maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. requirements
Such temporary uses need not comply with the maximum height requirements of this Ordinance.
- Maximum days per year30 days
Operation of such temporary uses shall be limited to a total of not to exceed 30 days per year.
- ProhibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. in residential districts
Such temporary uses are not permitted in the residential district classification as identified in Sec. 40.2-201 Zoning Districts Established.
- Exempt from yardYardThe open space left between a building and its lot line — the space a setback creates. setbacksSetbackThe distance a building must be held back from a lot line. except sight triangle
Such temporary uses need not comply with the yard setback requirements of this Ordinance except that associated structures and/or equipment must comply with the sight triangle and corner visibility standards in Sec. 40.2-218.
From the ordinance
Operation of such temporary uses shall be limited to a total of not to exceed 30 days per year. ... Such temporary uses are not permitted in the residential district classification as identified in Sec. 40.2-201.