Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Colocation analysis required
The applicant shall provide a listing of all structures within one-half a mile that are of a similar elevation along with an explanation of why a colocation on another tower is not possible, to the extent permitted by law.
- FAA permit required
No zoning permit for any radio, television, or microwave towers shall be issued until the applicant provides evidence that the Federal Aviation Administration (FAA) has granted a permit for said tower or that no permit is required.
- FAA report required
The applicant shall provide a copy of the Federal Aviation Administration (FAA) report and documentation that the application presents no hazard to any airport, or documentation that FAA review is not required.
- Minimum number of providers3 providers
Space shall be provided for at least three cellular or similar providers, unless expressly approved for less as a condition of the Use Permit.
From the ordinance
No zoning permit for any radio, television, or microwave towers shall be issued until the applicant provides evidence that the Federal Aviation Administration (FAA) has granted a permit for said tower or that no permit is required. The applicant shall provide a copy of the Federal Aviation Administration (FAA) report and documentation that the application presents no hazard to any airport, or documentation that FAA review is not required. Space shall be provided for at least three cellular or similar providers, unless expressly approved for less as a condition of the Use Permit. The applicant shall provide a listing of all structures within one-half a mile that are of a similar elevation along with an explanation of why a colocation on another tower is not possible, to the extent permitted by law.