- Conditional useConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. permit required for religious assemblyReligious facilityA building used for organised worship, often with halls and schools attached.
In the A-L, A-R and RVC districts: A conditional use permit shall be required for establishing a new place of religious assembly.
- Expansion threshold gross floor area7,500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The total gross floor area of the expansion itself exceeds 7,500 square feet
- Expansion threshold percent of existing100 pct
The gross floor area of the expansion is more than 100 percent of the existing gross floor area
- Expansion threshold worship area percent50 pct
The expansion includes an expansion of the principal worship area of more than 50 percent of the existing seating.
- Maximum gross floor area for antique shop3,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Antique shops shall not exceed 3,000 square feet in gross floor area unless a special use permit is obtained
- SetbackSetbackThe distance a building must be held back from a lot line. from property lines for battery200 ft
Be located at least 200 feet from all property lines, unless the adjacent parcel is zoned industrial, has an electric substation to which the battery energy storage system will connect and is located on the same side of the road, or is an adjacent parcel owned or leased by the battery energy storage system's owner or operator.
- SetbackSetbackThe distance a building must be held back from a lot line. from residential and commercial structures500 ft
Be located 500 feet from all residential and commercial structures.
- Type B buffer for antique shop adjoining residential
When adjoining a residential use type, a Type B buffer yard in accordance with section 5-400 shall be provided along the property line which adjoins the residential use type.
- Vegetative buffer width for battery100 ft
Battery energy storage systems located in the A-R district shall be fully screened on all sides from ground-level view by a vegetative buffer of at least 100 feet located within the required setbacks