Surry, Virginia · General provision

Sec. 4-705

Dimensional standards

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Initial permit duration5 years

    The special exception permit, if approved, shall initially be issued for a period not to exceed five years.

  • Maximum continuous occupancy120 days

    The maximum length of continuous occupancy in the same campground shall be no more than 120 days.

  • No campsite shall be located within 200 feet of single-family residence located on an adjoining property.

  • Road width10 ft

    Access to campsites shall be provided by a ten-foot all weather road.

From the ordinance

Density permitted is one campsite per 0.5 acres. The maximum number of campsites shall be ten sites.
Sec. 4-705