Chapter 20.118
Dimensional standards
Servicing
- Applies near
- Covelo Core; Covelo Fairbanks Road; Laytonville; South Leggett
- Geographic extent
- Applied to Covelo Core, Covelo Fairbanks Road, Laytonville, and South Leggett
Uses
Extracted standards
12 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Deadline for cannabis cultivation permit applications180 days
applications for cannabis cultivation permits within a CA Combining District must be submitted within one hundred eighty (180) days of the effective date of the ordinance that establishes the CA Combining District.
- Contiguity of parcels
All parcels within a CA Combining District shall be contiguous (excepting separations by public or private roads, rail lines, utility easements, or similar linear public facilities).
- Continuation of cultivation after repeal3 years
If a CA Combining District is repealed at any time, all current cultivators that do not meet the development standards of the underlying zoning district shall be permitted to continue operations for three (3) years from the date of repeal of the CA district.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. for cultivation site from adjoining legal parcel20 ft
The minimum setback for a cultivation site from any adjoining legal parcel under separate ownership, as required by section 10A.17.040(A)(5), shall be twenty (20) feet.
- Reduction of cultivation setbackSetbackThe distance a building must be held back from a lot line. allowed
The minimum setback for a cultivation site from an adjoining legal parcel under separate ownership may be reduced to less than twenty (20) feet or waived through the approval of an Administrative Permit pursuant to section 20.242.070(C).
- Minimum setbackSetbackThe distance a building must be held back from a lot line. for cultivation site to occupied legal residential structure on separate parcel20 ft
The minimum setback for a cultivation site to any occupied legal residential structure located on a separate legal parcel, as required by section 10A.17.040(A)(2), may be reduced to twenty (20) feet through the approval of an Administrative Permit pursuant to section 20.242.070(C).
- Fees for petitions
The Board of Supervisors shall require payment of fees or deposits, as established by the Board, for the processing of applications seeking to establish, repeal, or amend a CA Combining District
- Minimum number of legal parcels10 parcels
in no case be composed of fewer than ten (10) legal parcels
- Period during which no repeal or amendment may be initiated10 years
For the first ten (10) years after the date of adoption, no application to repeal or amend a CA Combining District, except as described in section 20.118.050(D), may be initiated by a member of the public.
- Permitted cannabis cultivation types
Cannabis cultivation permit types defined in section 10A.17.060 as (C) Small Outdoor, (C-A) Small Indoor, Artificial Light, and (C-B) Small Mixed Light may be permitted for existing cultivation sites on any parcel subject to the planning permit and approval requirements in section 20.242.040(C).
- Property owner support required for repeal or amendment60 pct
The application shall be accompanied by either: (1) A petition demonstrating support for the repeal or amendment of the CA district by more than sixty percent (60%) of all current property owners
- Sunset provision not applicable
The Sunset Provision for cannabis cultivation (section 10A.17.080(B)(2)(b)) shall not apply within the CA district.
From the ordinance
The minimum setback for a cultivation site from any adjoining legal parcel under separate ownership, as required by section 10A.17.040(A)(5), shall be twenty (20) feet.