- Rear setbackSetbackThe distance a building must be held back from a lot line. for five-sided lots
The rear setback on five-sided lots may be measured from either property line not contiguous to the front property line.
The front setback for flag lots is measured from the property line adjacent and perpendicular to the driveway/access strip, excluding the driveway/access strip.
- Front and street-side setbacksSetbackThe distance a building must be held back from a lot line. on private streets
On private streets, front and street-side setback lines are measured from the edge of pavement if no sidewalk exists.
A setback line is parallel to and at the specified distance from the corresponding front, side, or rear property line.
- Stormwater protection setbackSetbackThe distance a building must be held back from a lot line.
No projection may extend closer than 3 feet from a property line unless it does not slope toward the property line or a gutter is provided, then may extend to 1 foot.
From the ordinance
Setback line is parallel to property line. Required setbacks shall be unobstructed from ground to sky. Projections may encroach per Table 21.41.130-1.