Paso Robles, California · General provision

21.77.010

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Abandonment period12 months

    If a nonconforming use is abandoned for a period of twelve or more consecutive months, such use shall neither be reestablished nor resume operation

  • Enlargement restriction

    The site or building areas in which they are located shall not be enlarged or increased. Exception: Subject to approval of a conditional use permit, additions may be made to residential dwelling units in commercial and industrial districts, provided that said addition shall not increase the number of dwelling units on a property, including the addition of any accessory dwelling unit.

  • Intensity increase restriction

    The intensity or level of use or activity shall not be increased in terms of hours of operation, daily generation of vehicle trips, or other metric determined by the zoning administrator based on the use.

From the ordinance

Legally nonconforming land uses may continue to be operated and maintained subject to the following limitations: A. The site or building areas in which they are located shall not be enlarged or increased. Exception: Subject to approval of a conditional use permit, additions may be made to residential dwelling units in commercial and industrial districts... C. If a nonconforming use is abandoned for a period of twelve or more consecutive months, such use shall neither be reestablished nor resume operation...
21.77.010