Dendron, Virginia · District

B-2

Dimensional standards

B-2 lot requirementsSTREETMin depth 25 ft
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Lot

Minimum lot depth
25 ft

Uses

From the ordinance

| **M-1** | On primary Highway | 75 | None. Buffer yards may apply | 25 |
YARD & SETBACK STANDARDS