Monterey County Unincorporated, California · District

B-6

Building Site Zoning District B-6

No dimensional standards extracted

This district was identified in the ordinance, but no lot, setback or height figures were found in the sections read so far.

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Lot Line Adjustment Permit

    Lot line adjustments which reduce the size of a lot shall require an Administrative Permit. Adjustments of equal areas between lots do not require an Administrative Permit or a variance.

  • Setbacks to be not less than 'B-4' regulations, unless otherwise indicated on the final map or parcel map;

  • Subdivision Prohibition

    The lots as shown on the recorded final map or parcel map may not be further subdivided.

From the ordinance

F. B-6. 1. The lots as shown on the recorded final map or parcel map may not be further subdivided. Lot line adjustments may be allowed. Lot line adjustments which reduce the size of a lot shall require an Administrative Permit. Adjustments of equal areas between lots do not require an Administrative Permit or a variance. 2. Setbacks to be not less than 'B-4' regulations, unless otherwise indicated on the final map or parcel map;
21.42.030.F
B-6 — Monterey County Unincorporated, California · zoneoptics