Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Cemetery front yardYardThe open space left between a building and its lot line — the space a setback creates. setbackSetbackThe distance a building must be held back from a lot line.
Any burial plot on land abutting a public or private street shall comply with the required front yard setback of the underlying zoning district and 25 feet from all property lines.
- Cemetery setbackSetbackThe distance a building must be held back from a lot line. from property lines25 ft
25 feet from all property lines.
From the ordinance
Any burial plot on land abutting a public or private street shall comply with the required front yard setback of the underlying zoning district and 25 feet from all property lines.