Dendron, Virginia · General provision

Sec. 1-501.1

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total

  • Maximum utility-scale solar land area7 pct

    total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total

  • Districts where solar facilities are permitted

    Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.

  • Distance to high-voltage transmission lines1 miles

    the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines

From the ordinance

the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines. Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
Sec. 1-501.1