Dendron, Virginia · General provision

Sec. 1-501.1

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Supplemental plantings must reach a minimum height canopy of 20 feet within ten years.

  • total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total.

  • Maximum utility-scale solar as percentage of developable land7 pct

    shall not exceed seven percent of developable land within the county

  • Permitted only in M-1 and M-2 districts

    Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.

  • Centroid within one mile of high-voltage transmission lines1 mile

    the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines.

  • Minimum vegetative buffer around utility-scale projects300 ft

    Such vegetative buffers shall be a minimum of 300 feet surrounding all utility-scale projects.

From the ordinance

the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
Sec. 1-501.1