Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Supplemental plantings canopy heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. within 10 years20 ft
Supplemental plantings must reach a minimum height canopy of 20 feet within ten years.
- Maximum total utility-scale solar acreage10,695 acresacre43,560 square feet — about the size of an American football field without the end zones.
total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total.
- Maximum utility-scale solar as percentage of developable land7 pct
shall not exceed seven percent of developable land within the county
- Permitted only in M-1 and M-2 districts
Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
- Centroid within one mile of high-voltage transmission lines1 mile
the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines.
- Minimum vegetative buffer around utility-scale projects300 ft
Such vegetative buffers shall be a minimum of 300 feet surrounding all utility-scale projects.
From the ordinance
the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.