Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum floor area increase for nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. use extension25 pct
Extension of a nonconforming use in a building so as to increase floor area by not more than 25 percent.
- Maximum duration for temporary use permit24 months
authorized by the issuance of a temporary and revocable permit for not more than a 24-month period
From the ordinance
Extension of a nonconforming use in a building so as to increase floor area by not more than 25 percent. Temporary uses and structures in any district not specifically listed in the regulations for and determined by the board to be in the public interest for the district in which located; provided that such uses be of a temporary nature and do not involve the erection of substantial buildings. Such use or structure shall be authorized by the issuance of a temporary and revocable permit for not more than a 24-month period