Sec. 24-2314
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Time to install required improvements24 months
All improvements must be installed within 24 months of construction plan approval unless the Planning Director approves a longer period
- Minimum gross floor area for nonresidential plan of development65,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Nonresidential development having a gross floor area or principal use area of 65,000 square feet or more
- Decision deadline for plan of development60 days
Unless the applicant requests an extension of time, the Planning Director must make a decision on the application within 60 days of submission
- Decision deadline with state agency review35 days
or, if state agency review is required, within 35 days of receipt of approvals from all reviewing agencies.
- Distance to public water/sewer for required connection300 ft
If the proposed development is not served by public water or public sewer, connection must be made to public water and public sewer, as applicable, when available within 300 feet of the site.
- Minimum dwelling unitsDwelling unitOne independent home: its own kitchen, bathroom and entrance. for plan of development in certain districts50 units
Residential development in the R-5A, R-5B, R-5, R-6, RTH, Mixed Use, and Planned Development districts consisting of 50 or more dwelling units
From the ordinance
Residential development in the R-5A, R-5B, R-5, R-6, RTH, Mixed Use, and Planned Development districts consisting of 50 or more dwelling units; Nonresidential development having a gross floor area or principal use area of 65,000 square feet or more; ... connection must be made to public water and public sewer, as applicable, when available within 300 feet of the site.