Sec. 24-2314 through 24-2320
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Fire hydrant requirement
The construction plan must show, and the developer must provide, fire hydrants as required by the Statewide Fire Prevention Code and the Department of Public Utilities standards.
- Improvement installation deadline24 months
All improvements must be installed within 24 months of construction plan approval unless the Planning Director approves a longer period due to the size or complexity of the project.
- Notice for street/storm sewer work24 hours
The owner must notify the County Engineer at least 24 hours prior to beginning any work on streets or storm sewers.
- Notice for water/sewer work48 hours
The owner must notify the Department of Public Utilities at least 48 hours prior to beginning any work on County water or sewer construction.
- Administrative modification of setbacksSetbackThe distance a building must be held back from a lot line. allowed
The Planning Director is authorized to approve administrative modifications to the standards in Table 2319: Allowed Administrative Modifications, up to the amounts specified in Table 2319.
- Single-family dwellingSingle-family dwellingOne dwelling unit on its own lot, usually detached from its neighbours. exempt from site plan
Construction of or alterations to one single-family dwelling is exempt from site plan requirements.
From the ordinance
Procedural requirements for plan of development, site plan, variance, interpretation, proffer interpretation, administrative modification, and appeal.