Henrico County Unincorporated, Virginia · General provision

Sec. 24-4314.B

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Sewage plant distance from residential400 ft

    A sewage treatment plant must not be located within 400 feet of any Residential district

  • Substation distance from residential100 ft

    An electric substation serving a community- or region-wide area must not be located within 100 feet of any lot in a Residential district

Setback

From the ordinance

An electrical power generation facility must not be located within 250 feet of any lot line.
Sec. 24-4314.B