Henrico County Unincorporated, Virginia · General provision

Sec. 24-4314.D

Dimensional standards

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

Height

Noise

  • Wind facility noise limit55 dBA

    The noise produced by a wind energy facility during normal operation must not exceed 55 dBA at any lot line.

Other

  • Wind turbine ground clearance75 ft

    Blade tips or vanes must have a minimum ground clearance of 75 feet above grade

From the ordinance

The height of any tower, measured at the highest point of the arc of the blades, must not exceed 199 feet.
Sec. 24-4314.D