Henrico County Unincorporated, Virginia · General provision
Sec. 24-5124
Dimensional standards
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Loading berth length for industrial45 ft
For general industrial, distribution, or warehousing uses, each loading berth must be at least 45 feet long.
- Loading berth length for other uses25 ft
For all other uses, each loading berth must be at least 25 feet long.
- Loading berth overhead clearance15 ft
Each loading berth must have at least 15 feet overhead clearance.
- Loading berth width10 ft
Each loading berth must be at least 10 feet wide.
- Loading berth front yardYardThe open space left between a building and its lot line — the space a setback creates. setbackSetbackThe distance a building must be held back from a lot line. in M-1, M-2, M-350 ft
In M-1, M-2, and M-3 districts, loading berths may occupy front yard if set back a minimum of 50 feet from property line.
- Loading berth setbackSetbackThe distance a building must be held back from a lot line. from residential districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.50 ft
Loading berths must not be located within 50 feet of a lot in a Residential zoning district.
From the ordinance
Loading Standards. Dimensional Standards. Each loading berth must be at least 10 feet wide and must have at least 15 feet overhead clearance...