Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Sign permit expiration6 months
A zoning permit for a sign shall become null and void if the sign is not erected within six (6) months after the date the zoning permit is issued.
From the ordinance
A zoning permit for a sign shall become null and void if the sign is not erected within six (6) months after the date the zoning permit is issued. Upon written request and for good cause shown, the Zoning Administrator may grant one (1) six-month extension.