Orange County Unincorporated, California · General provision
Sec. 7-9-89.2, 7-9-89.4, 7-9-89.5
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- 180-day advance notice of termination
The property owner shall provide all tenants a minimum of one hundred eighty (180) days' advance notice of the termination of their tenancy...
- Engineering report required
Each application for conversion project shall be accompanied by an engineering report on the general condition of all structural, electrical, plumbing, and mechanical elements...
- 90-day preemptive right to purchase
The property owner shall provide tenants a ninety-day preemptive right to purchase a unit or right of exclusive occupancy upon more favorable terms and conditions...
- Tenant notification required
Within fifteen (15) days after the filing of the application, the Director shall notify each tenant of the application...
From the ordinance
Conversion projects shall conform to the standards and requirements applicable to the district in which the proposed project is located at the time of approval.