Orange County Unincorporated, California · General provision

Sec. 7-9-117.5

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum duration of temporary mobilehome as additional dwelling2 years

    Any permit approved by the provisions of this section shall be for a maximum of two (2) years after the issuance of a Certificate of Use and Occupancy for such use

  • Maximum duration of temporary mobilehome during construction1 years

    Such temporary mobilehome shall be permitted for a period of time not to exceed one (1) year, or until the issuance of a Certificate of Use and Occupancy for the main building, whichever occurs first.

From the ordinance

Such temporary mobilehome shall be permitted for a period of time not to exceed one (1) year, or until the issuance of a Certificate of Use and Occupancy for the main building, whichever occurs first. ... Any permit approved by the provisions of this section shall be for a maximum of two (2) years after the issuance of a Certificate of Use and Occupancy for such use
Sec. 7-9-117.5