Orange County Unincorporated, California · General provision
Sec. 7-9-117.5
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum duration of temporary mobilehome as additional dwelling2 years
Any permit approved by the provisions of this section shall be for a maximum of two (2) years after the issuance of a Certificate of Use and Occupancy for such use
- Maximum duration of temporary mobilehome during construction1 years
Such temporary mobilehome shall be permitted for a period of time not to exceed one (1) year, or until the issuance of a Certificate of Use and Occupancy for the main building, whichever occurs first.
From the ordinance
Such temporary mobilehome shall be permitted for a period of time not to exceed one (1) year, or until the issuance of a Certificate of Use and Occupancy for the main building, whichever occurs first. ... Any permit approved by the provisions of this section shall be for a maximum of two (2) years after the issuance of a Certificate of Use and Occupancy for such use