Commercial
4Local Business District
- Min lot
- 40,000 sq ft (0.92 ac)
- Max height
- 45 ft
- Front setback
- 75 ft
- Permitted uses
- 45
Commercial
- Min lot
- 40,000 sq ft (0.92 ac)
- Max height
- 45 ft
- Front setback
- 75 ft
- Permitted uses
- 45
General Commercial District
- Min lot
- 40,000 sq ft (0.92 ac)
- Max height
- 45 ft
- Front setback
- 75 ft
- Permitted uses
- 63
Industrial
4Light Industrial District
- Min lot
- 30,000 sq ft (0.69 ac)
- Max height
- 75 ft
- Front setback
- 75 ft
- Permitted uses
- 29
Heavy Industrial District
- Min lot
- 40,000 sq ft (0.92 ac)
- Max height
- 75 ft
- Front setback
- 75 ft
- Permitted uses
- 34
Light Industrial District
- Max height
- 30 ft
General provisions
387 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.
A special exception shall expire after two years from the date of approval if no substantial construction has taken place in accordance with the plans for which such special exception was granted, unless the BZA grants a longer period of time for good cause shown.
The BZA shall hold a public hearing on the special exception within 60 days of receipt of a completed application
A garage or other building accessory to a single-family dwelling which building does not comply with the regulations of the district in which it is located.
Extension of a nonconforming use in a building so as to increase floor area by not more than 25 percent. Temporary uses and structures in any district not specifically listed in the regulations for and determined by the board to be in the public interest for the district in which located; provided that such uses be of a temporary nature and do not involve the erection of substantial buildings. Such use or structure shall be authorized by the issuance of a temporary and revocable permit for not more than a 24-month period
Variance shall expire after two years from the date of approval if no substantial construction has taken place in accordance with the plans for which such variance was granted, unless the BZA grants a longer period of time for good cause shown.
Variance shall expire after two years from the date of approval if no substantial construction has taken place in accordance with the plans for which such variance was granted, unless the BZA grants a longer period of time for good cause shown.
The BZA shall hold a public hearing on the variance request within 90 days of receipt of a completed application
This petition must be filed within 30 days of the BZA's decision.
the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total.
the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines.
Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total.
the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines.
Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines. Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.
Such vegetative buffers shall be a minimum of 300 feet surrounding all utility-scale projects. Supplemental plantings must reach a minimum height canopy of 20 feet within ten years.
Such vegetative buffers shall be a minimum of 300 feet surrounding all utility-scale projects.
Supplemental plantings must reach a minimum height canopy of 20 feet within ten years.
The applicant shall inform the zoning administrator and adjacent property owners in writing of the date, time and location of the meeting, at least seven but no more than 14 days in advance of the meeting.