Municipality · Virginia

Dendron

The ordinance has been retrieved, read and turned into structured rules.
12
Districts
401
Extracted rules
1,355
Standards
5
Chapters read

Zoning districts

12 districts, grouped by category.

General provisions

387 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

Sec. 1-3041 standards

A special exception shall expire after two years from the date of approval if no substantial construction has taken place in accordance with the plans for which such special exception was granted, unless the BZA grants a longer period of time for good cause shown.

Sec. 1-3041 standards

The BZA shall hold a public hearing on the special exception within 60 days of receipt of a completed application

Sec. 1-3043 standards

A garage or other building accessory to a single-family dwelling which building does not comply with the regulations of the district in which it is located.

Sec. 1-3042 standards

Extension of a nonconforming use in a building so as to increase floor area by not more than 25 percent. Temporary uses and structures in any district not specifically listed in the regulations for and determined by the board to be in the public interest for the district in which located; provided that such uses be of a temporary nature and do not involve the erection of substantial buildings. Such use or structure shall be authorized by the issuance of a temporary and revocable permit for not more than a 24-month period

Sec. 1-3051 standards

Variance shall expire after two years from the date of approval if no substantial construction has taken place in accordance with the plans for which such variance was granted, unless the BZA grants a longer period of time for good cause shown.

Sec. 1-3051 standards

Variance shall expire after two years from the date of approval if no substantial construction has taken place in accordance with the plans for which such variance was granted, unless the BZA grants a longer period of time for good cause shown.

Sec. 1-3051 standards

The BZA shall hold a public hearing on the variance request within 90 days of receipt of a completed application

Sec. 1-3071 standards

This petition must be filed within 30 days of the BZA's decision.

Sec. 1-501.12 standards

the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total.

Sec. 1-501.11 standards

the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines.

Sec. 1-501.11 standards

Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.

Sec. 1-501.12 standards

the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total.

Sec. 1-501.11 standards

the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines.

Sec. 1-501.11 standards

Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.

Sec. 1-501.14 standards

the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... the centroid of such facilities shall be within one-mile of existing high-voltage electric transmission lines. Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.

Sec. 1-501.16 standards

the total approved utility-scale solar generation facilities shall not exceed seven percent of developable land within the county or 10,695 acres in total. ... Such facilities are permitted only in the (M-1) Light Industrial and the (M-2) General Industrial Zoning Districts.

Sec. 1-503.12 standards

Such vegetative buffers shall be a minimum of 300 feet surrounding all utility-scale projects. Supplemental plantings must reach a minimum height canopy of 20 feet within ten years.

Sec. 1-503.11 standards

Such vegetative buffers shall be a minimum of 300 feet surrounding all utility-scale projects.

Sec. 1-503.12 standards

Supplemental plantings must reach a minimum height canopy of 20 feet within ten years.

Sec. 1-503.12 standards

The applicant shall inform the zoning administrator and adjacent property owners in writing of the date, time and location of the meeting, at least seven but no more than 14 days in advance of the meeting.

Source documents

The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.